BIM 5D methodology implementation proposal for industrial foundation works in the Oxygen Plant in Arauco
Keywords:
management of information, methodology, BIM 5D, civil works, costsAbstract
Due to the growth of the architecture, engineering and construction industry (AEC), it is essential to update the work methodologies, especially in the design and construction stage, since this is where the cost of the project is concentrated. The main objective is the management of information for the prevention of errors and the correct execution of the project. This document proposes a strategy for the implementation of the BIM methodology in 5D, including a 3D model, time and cost, in an industrial construction company, specifically in civil works. This strategy was designed on the basis of the Oxygen Plant project, in order to establish the steps of the methodology. To then apply the BIM methodology in the project, evidencing the cost benefits of the activities and estimating the cost of BIM implementation.