Abstract

This article presents a parametric study that uses the finite element (FE) method to analyse the problem of long-term settlements following twin tunnel construction in low permeability clay. Similar ground conditions to those typically found in central London, UK, were modelled. The construction process of the tunnels was simulated and thereafter a special boundary condition was used, enabling the FE model to consider the tunnels as fully permeable drains during the post-construction period. Several tunnel depths and separations were studied. The long-term interaction between the tunnels and the manner in which the long-term displacements -both vertical and horizontal - developed, were analysed. Conclusions are drawn about the principal factors that drive these movements. Finally, the potential building damage associated with the short and long-term movements obtained from the FE analyses is assessed, compared and discussed.

References

Burland, J.B., Standing, J.R. and Jardine, F.M. (2001). Building response to tunnelling: case studies from construction of the Jubilee Line Extension, London. Volume 2: case studies, London, CIRIA and Thomas Telford

Burland, J.B. (1995). Assesment of risk of damage to buildings due to tunnelling and excavation. Proceedings 1st International Conference on Earthquake Geotechnical Engineering, IS-Tokyo

Burland, J.B. and Wroth, C.P. (1974). Settlement of buildings and associated damage. SOA Review. Conf. Settlement of Structures, Cambridge, Pentech Press, London, 611-654

Day, R.A. and Potts, D.M. (1990). Curved Mindlin beam and axi-symmetric shell elements - A new approach. International Journal for Numerical Methods in Engineering 30, 1263-1274. https://doi.org/10.1002/nme.1620300704

Jardine, R.J., Potts, D.M., Fourie, A.B. and Burland, J.B. (1986). Studies of the influence of non-linear stress-strain characteristics in soil-structure interaction. Géotechnique 36, No. 3, 377-396. https://doi.org/10.1680/geot.1986.36.3.377

Mair, R.J. (2008). Tunnelling and geotechnics: New horizons. Géotechnique 58, No 9, 695-736. https://doi.org/10.1680/geot.2008.58.9.695

Mair, R.J. and Taylor, R.N. (1997). Bored tunnelling in the urban environment: State-of-the-art report and theme lecture. Proceedings 14th International Conference on Soil Mechanics and Foundation Engineering, Hamburg 4, 2353-2385

New, B.M. and O'Reilly, M.P. (1991). Tunnelling induced ground movements: predicting their magnitude and effect. Proceedings 4th International Conference on Ground Movements and Structures, Cardiff, 671-697

Potts, D.M. and Zdravkovic, L. (1999). Finite element analysis in geotechnical engineering: Theory. London: Thomas Telford

Potts, D.M. and Zdravkovic, L. (2001). Finite element analysis in geotechnical engineering: Application. London: Thomas Telford.

Potts, D.M. and Addenbrooke, T.I. (1997). A structure's influence on tunnelling-induced ground movements. ICE Proceedings Geotechnical Engineering 125, N°2, 109-125. https://doi.org/10.1680/igeng.1997.29233

Vaughan, P.R. (1989). Non-linearity in seepage problems: theory and field observations. De Mello Volume, 501-516, Sao Paulo: Editora Edgard Blucher Ltda.

Downloads

Published

2015-06-01

Issue

Section

Articles

How to Cite

Numerical study of long-term settlement following twin tunnel construction. (2015). Obras Y Proyectos, 17, 23-29. https://doi.org/10.4067/S0718-28132015000100003